| Project |
Client |
Date |
Scope of Work |
Shah Gas Development
U.A.E.
|
Fluor |
2008 |
FEED design of an onshore Sulphur Transportation System,
in the UAE. The system consists of a series of insulated
PIP pipelines (adding up to a total of over 800km), in
which molten sulphur is transported on the inner pipe.
In the annulus of the PIP system, superheated water is
circulated to maintain the sulphur temperature within
the range at which it can be transported in liquid format,
i.e. between 125 and 150C. The design also includes single,
insulated water return pipelines to circulate the superheated
water. |
Froy Redevelopment
North Sea
(Norwegian Sector) |
Det Norske |
2008 |
Conceptual design for redevelopment pipeline system
including 14” production line, 10” test line,
12” water injection, 6” gas injection, 140/160mm
umbilical and 12” gas export.
Establish feasible design solutions for the system, determine
procurement and construction requirements and prepare
development cost estimates. |
Pierce Gas Lift
North Sea
|
Shell |
2008 |
Conceptual design of one 3.5km pipeline and two manifolds
for the Shell Pierce Field Gas Lift Development. |
Nexen Buzzard
North Sea |
CSL/Nexen |
2007 |
FEED design of 4km oil export lines and NGL export options,
including SSIV and tie-in structures. |
Topaz
North Sea |
RWE/Vision Oil & Gas |
2007 |
FEED of a 15km 6” subsea tie-back development
in Southern North Sea. Prelimary Design & ITT Support. |
Okporo
Nigeria |
Addax/Subsea7 |
2006- |
FEED study for the Okporo field which encompasses a
two-well subsea development tied back via flexible to
an existing FPSO. |
North Idku
Egypt |
RWE/Genesis |
2006 |
FEED of 7km 10” infield and 33km 16” export
pipelines and tie-in spools including shore approach design. |
Raven
Egypt |
BP |
2005 |
Conceptual design of a subsea deepwater field. |
Devenick Field Development
North Sea |
BP |
2004 |
Pre-FEED engineering of 12km 10” system transporting
corrosive fluids. Identify and assess suitable pipe materials
at acceptable costs. Ongoing support is being provided
to BP. |
Offshore North Sinai
Egypt |
GUPCO |
2004 |
Pre-FEED to determine the requirements of the pipe and
seabed preparation. |
Saturn Field Development
North Sea |
ConocoPhillips |
2004 |
FEED engineering was carried out and provided the basis
for proceeding with the design of an extensive pipeline
system in areas of high environmental loading. |
Helvellyn Field Development
North Sea |
ATP |
2003 |
FEED and route selection in mobile sand wave areas.
Detailed design of pipeline (8” x 16km), associated
subsea structures and riser. |
Terra Nova
Newfoundland |
Technip
(Petro-Canada) |
2003 |
Concept design of insulated 10in single pipe and 16in/10in
high temperature PIP options for infield flowlines. |
Gulf of Aqaba Pipeline
Jordan |
East Gas Company |
2002/03 |
Pre-FEED and FEED engineering for this large diameter
(36” x 15km) technically challenging project, including
deepwater (900m), rough seabed terrain and seismic hazards.
Specified and supervised survey and interpretation of
survey results.
Retains record to-date for largest diameter pipeline installed
in 900m water depth. |
Tangguh
Indonesia |
BP |
2002 |
Conceptual design for the twin CRA internally clad pipelines
(24” x 16km) carrying corrosive fluid in an environment
of very high environmental loading. The Pre-FEED included
the application of limit state methods to the assessment
of the pipeline during operation, to determine requirements
for measures to prevent spans. |
| Back