Conceptual, Pre-FEED and FEED Track Record

Project Client Date Scope of Work
Shah Gas Development
U.A.E.
Fluor 2008 FEED design of an onshore Sulphur Transportation System, in the UAE. The system consists of a series of insulated PIP pipelines (adding up to a total of over 800km), in which molten sulphur is transported on the inner pipe. In the annulus of the PIP system, superheated water is circulated to maintain the sulphur temperature within the range at which it can be transported in liquid format, i.e. between 125 and 150C. The design also includes single, insulated water return pipelines to circulate the superheated water.
Froy Redevelopment
North Sea
(Norwegian Sector)
Det Norske 2008 Conceptual design for redevelopment pipeline system including 14” production line, 10” test line, 12” water injection, 6” gas injection, 140/160mm umbilical and 12” gas export.
Establish feasible design solutions for the system, determine procurement and construction requirements and prepare development cost estimates.
Pierce Gas Lift
North Sea
Shell 2008 Conceptual design of one 3.5km pipeline and two manifolds for the Shell Pierce Field Gas Lift Development.
Nexen Buzzard
North Sea
CSL/Nexen 2007 FEED design of 4km oil export lines and NGL export options, including SSIV and tie-in structures.
Topaz
North Sea
RWE/Vision Oil & Gas 2007 FEED of a 15km 6” subsea tie-back development in Southern North Sea. Prelimary Design & ITT Support.
Okporo
Nigeria
Addax/Subsea7
2006-
FEED study for the Okporo field which encompasses a two-well subsea development tied back via flexible to an existing FPSO.
North Idku
Egypt
RWE/Genesis
2006
FEED of 7km 10” infield and 33km 16” export pipelines and tie-in spools including shore approach design.
Raven
Egypt
BP
2005
Conceptual design of a subsea deepwater field.
Devenick Field Development
North Sea
BP
2004
Pre-FEED engineering of 12km 10” system transporting corrosive fluids. Identify and assess suitable pipe materials at acceptable costs. Ongoing support is being provided to BP.
Offshore North Sinai
Egypt
GUPCO
2004
Pre-FEED to determine the requirements of the pipe and seabed preparation.
Saturn Field Development
North Sea
ConocoPhillips
2004
FEED engineering was carried out and provided the basis for proceeding with the design of an extensive pipeline system in areas of high environmental loading.
Helvellyn Field Development
North Sea
ATP
2003
FEED and route selection in mobile sand wave areas.
Detailed design of pipeline (8” x 16km), associated subsea structures and riser.
Terra Nova
Newfoundland
Technip
(Petro-Canada)
2003
Concept design of insulated 10in single pipe and 16in/10in high temperature PIP options for infield flowlines.
Gulf of Aqaba Pipeline
Jordan
East Gas Company
2002/03
Pre-FEED and FEED engineering for this large diameter (36” x 15km) technically challenging project, including deepwater (900m), rough seabed terrain and seismic hazards. Specified and supervised survey and interpretation of survey results.
Retains record to-date for largest diameter pipeline installed in 900m water depth.
Tangguh
Indonesia
BP
2002
Conceptual design for the twin CRA internally clad pipelines (24” x 16km) carrying corrosive fluid in an environment of very high environmental loading. The Pre-FEED included the application of limit state methods to the assessment of the pipeline during operation, to determine requirements for measures to prevent spans.