KW Ltd: Engineering,consulting technology
Track Record:
Conceptual, Pre-FEED and FEED
Detailed Design
Owner Engineer and Design Support
Lateral Buckling / Pipeline Walking
OOS / UHB
HPHT and PIP
Deepwater
Integrity Engineering
Egypt Projects / Cairo Office

 

OOS/UHB Track Record

Project Client Date Scope of Work
Curlew Development
Technip/Shell
2008 8”/3” piggybacked (5.7km)
YME Field Development Technip/Talisman 2008 10” pipeline, 6” water injection + 4” service line (12km each)
Volund Field Development Acergy Norway/
Marathon
2008 12” pipeline + 4” gas lift line (8.9km each)
E.On Ruhrgas Development Penspen 2008 8” pipeline (14km)
Silverstone Development ADIL 2008 6” gas line (3.7km)
Ettrick Nexen Field Development

Nexen/Nexen

2008 10”/4” + 2x8 Flexibles (1.4km)
6” Flexible (6.5km)
Kevlin Development ConcoPhillips/CoP 2007 12” (12.5km)
GKA Development Subsea7/VPC 2007 10” (32.3km)
Starling Field Development Allseas/Shell 2007 20”/12” PIP (33km)
Talisman Duart Field Development Talisman/Talisman 2007 8”/3” piggybacked line (8km)
Minke Field Development Acergy/Gaz De France 2007 8" (15.1km)
Mimas & Tethys Field Development ConocoPhillips 2007 10"/3" Piggybacked Line (3km)
10"/3" Piggybacked Line (14km)
Rev Field Development Talisman 2007 12" (9.2km)
Affleck Field Development Technip/Maersk 2007 12"/8" Pip (28km)
Wood and Gas Export (WaGE) Technip/Talisman 2006 6” (11km) + 10”/6” PIP & 2” and piggyback (10.5km)
Tweedsmuir Field Development Technip/Talisman 2006 10"/4" Piggybacked Line (52.8km)
10" Pipeline (5.94km)
Paladin Enoch Development

Subsea7/Talisman

2006- 8"/3" piggybacked (15km)
Talisman Blane Development Talisman 2006- 10" (33km), 8" (33km)
Talisman Galley Redevelopment Talisman 2006- 10" (23.5km)
Maria Field Development Technip/BG Group 2006- 12" (11km)
Wenlock and Davy East Development

Pegasus/AT & Bluewater

2006- 6" (5.7km), 8"/3" piggybacked (36km)
Teal P2 Development Technip/Shell 2006- 8" (1.34km)
Njord Field Development Acergy Nor/Norsk Hydro 2006- 12" (40.3km)
Alvheim Development Project Technip/Marathon 2006 2 off 12" Rigid (2.2km), 1 off 12" Rigid (4.5km), 1 off 10" (5.3km), 1 off 14" (36.5km), 1 off 14" (3.6km)
Arthur III Development Project Pegasus/Exxon Mobil 2006 8" Flexible (2.7km)
Vilje Development Project Technip/Norsk Hydro 2006 1 off 12" Rigid (19km), 1 off 6" Rigid (21km)
WINZ L5C Field Development Subsea7/Wintershall 2006 1 off 10" 13%Cr (8.1km)
Merganser Field Development Technip/Shell 2006 8" (3.8km)
Newfield Grove Development Newfield 2006 10" (13.3km)
Forvie Development Project Stolt/TOTAL 2005 8" Rigid (2.2km) and 8" Rigid (0.5km)
L4G Development Subsea7/TOTAL 2005 6" Rigid (10.6km) and 10"/3" piggyback (6.7km)
PICT Field Development Technip/Petro-Canada UK 2005 12"/4" (18.9km) & 6" (18km)
Simian & Sapphire Field Development Technip/GUPCO 2005 4" x 4 pipelines (113.6km, 45.6km, 83.3km, 16.1km)
Valdemar B to Tyra West B Stolt/Maersk 2005 12" Rigid (18.3km)
Howe Field Development Shell 2005 12"/8" PIP & 4" Piggback (14km)
Mobile Arthur II - Flexible Stolt/Maersk 2005 8" Flexible (3.6km) - Ex Gawain Flexible
Tors Development Project Pegasus/ATP 2005 8" Rigid (20km) and 12" Rigid (20km)
Vigdis Field Development
Stolt/Norsk Hydro
2004 12" (4.4km) & 12" (4.3km) & 12" (9.2km) & 10" Flexible (4.9km)
Stine Segment-I Field Location Subsea7/DONG
2004 8"/3" (8.9km)
Ninian Field Development
Subsea7/CNR
2004 10" (5.6km)
Howe Field Development
Technip/Shell
2004 12"/8" PIP & 4" Piggback (14km)
K4BE-K4A
Technip/TOTAL
2004 10" (8km)
Q5-A to Q8-B Development Project
Stolt/Wintershall
2004 8" (14km)
10" WI Replacement Project
Stolt/Paladin Expro
2004 10" (8.3km)
D12A Field Development
Subsea7/Wintershall
2004 10" (4.9km)
Annabel Field Development
Subsea7/VPC
2004 10" (17.73km)
Camelot Arthur Field Development
Stolt/Exxon Mobil
2004 12" (29.2km)
Banff FPSO to Banff Manifold Development Project
PGS 2004 8" Flexible pipeline (1.7km)
Scoter Field Development
Technip/Shell
2003 12" (11.7km)
Juno Field Development
Technip/BG & BP
2003 8" (6.3km) & 6" (3.4km) & 6" (4.4km) & 16" (12.9km) & 3" (7.1km) & 8" (5.4km) & 12" (14.8km)
CMS III Field Development
Stolt/ConocoPhillips
2003 12" (12.8km) & 12"/3" (21.5km) & 10"/3" (8.4km) & 10"/3" (8.4km) & 10"/3" (5.5km)
Brae B - Miller and Braemar Field Development
Technip/Marathon
2003 10"/6" PIP (12km), 16" (8.5km)
Skirne Byggve Field Development
Stolt/TOTAL
2003 12" (25.1km)
Greensand Field Development
Technip/Marathon
2003 10" (6.9km)
Nuggets NGE-N3 Development Project
Technip/TOTAL
2003 8"/4" (13.1km)
Seven Heads Field Development
Technip/Ramco
2003 8" X 5 pipelines (1.44km, 4.6km, 6.2km, 5.7km, 7.4km)
Rose Field Development
Subsea7/Centrica Resources
2003 10" (9.1km)
L5-B Field Development Subsea7/Wintershall 2003 10" (6.4km)
K7 Field Development
Stolt/NAM 2003 12" (16.8km)
West Akhen Field Development
BP/GUPCO
2002 14"/3" (20.6km) & 6" (20.5km)
Caledonia-Britannia Field Development
Technip/ChevronTexaco
2002 12"/8" PIP (5.9km) & 4" piggyback
Helvellyn Field Development CDS/ATP
2002 8" (15.5km)
Viscount Field Development ConocoPhillips 2002 12"/3" (11.3km)
Guillemot Field Development

Technip/Amerada Hess

2002 4" (13.6km)
ETAP Satellite Development Project

Stolt/BP

2002 10"/4" (19.6km) & 10" (12.8km) & 10" (2.2km)
South Everest Field Development

Stolt/BP

2001 7.5" Flexible (7.4km)
Beauly Field Development

Stolt/Talisman

2001 6"/2" (5.2km)
Birch Field Development

VPC

2001 10" (13.7km) Post Buckling Analysis
Kyle Field Development Technip/Maersk
2001 12" (17km)
Nuggets Phase-I Field Development Technip/TOTAL 2001 12" (39.5 km) & 12" (14.4km) & 6" (4.3km)
Kinsale Area Gas Fields Reprofiling Development
Technip/Marathon
2001 12" (7km)
Vale Field Development Stolt/Norsk Hydro
2001 8" (16km)
Blake Field Development Technip/BG
2001 16"/12" PIP (9km) & 12" (8.9km) & 12" (8.8km)
North Davy Field Development
Technip/BP
2001 8" (10.2km)
Hotton Field Development Technip/BP
2001 8" (11.6km)
Otter Field Development Technip/TOTAL
2001 10" (21km) & 10" (21km)
Hannay Field Development Stolt/Talisman
2001 8"/3" (13.2km) - DnV Design was adopted
Lewis-I Field Development Technip/Exxon Mobil
2001 14"/8" PIP (7km)
Angus Field Development Amerada Hess 2001 8"/3" (15.6km)
Kinsale Area Gas Fields Reprofiling Development (interplatform)
Technip/Marathon

2001 12" (5km) & 12" (1.2km)

Halfdan Field Development Stolt/Maersk 2000 12" (8.6km) & 12" (8.7km) & 14" (16.7km)
Cook Enterprise Field Development
Technip/Enterprise Oil
2000 12"/8" PIP & 4" Piggback (11.7km)
Vixen Field Development Technip/ConocoPhillips
2000 10" (8.5km)
L8 Field Development Stolt/Wintershall
2000 6" (10.2km) & 12" (2.9km)
Bittern Field Development Stolt/Amerada Hess
1999 8" (22km) & 10" (22km) & 12" (22km) & 4" (22km)
Orion Field Development Stolt/Talisman
1999 10" (15.4km)
Jupiter Phase II Development Project
Mentor/ConocoPhillips
1999 12"/4" (4.5km)
ECA Development Project Mentor/BG
1999 10" (26.4km)
Kinsale-Bravo Development Project
Technip/Marathon
1999 12" (6.9km)
North West Bell Development Project APA/Amaco 1999 6" (9.3km)
Back to top of page
© KW Ltd 2008