| Project |
Client |
Date |
Scope of Work |
Gulf Of Aqaba Annual
Survey |
East Gas Company (EGC) |
Ongoing |
Assess integrity of Gulf of Aqaba pipeline as per annual
survey carried out. Scope includes analysing the survey
data, producing an annual integrity report, highlighting
the key operating and in-service factors to ensure safe
appropriate operation. |
Dubai Petroleum O-ZB and N-B Subsea Water Injection
Replacement Pipeline
Offshore Dubai
|
Valentine Maritime (Gulf) L.L.C. |
2008 |
Detailed design of two 10” water injection pipelines
replacing the existing lines between O-ZB and N-B platforms
with lengths of 1.2km and 1.6km. |
| North Bardawil |
CTC/Petrobel |
2008 |
Detailed design of 2 umbilicals: 17km main umbilical
between Barboni Platform and Zaraf well and 7km infield
umbilical between Zaraf and Assad wells in North Bardawil
field. Scope included routing, installation, crossing
and stability. |
Rehabilitation Phase 1
East Tanka Pipeline Replacement |
GUPCO |
2007 |
Detailed design of a 5km x 12” replacement pipeline
and 2 tie-in spoolpieces between East Tanka and October
J platforms due to failure by internal corrosion. |
| Damaged Pipeline Evaluation and Repair |
Confidential |
2007 |
Assist survey inspection operations; assess repair solutions
for 22” pipeline. Scope includes supplying technical
speciality offshore and evaluation of damage and performing
a full integrity assessment for the damaged sections.
|
| West Ashrafi Umbilical |
CTC |
2007 |
Detailed design of 8.5km service umbilical for the Ashrafi
field. Scope included routing, freespan, crossing design,
installation analysis and shore pull analysis. |
Rehabilitation Phase 1
July 10 to Ras Shukheir Pipeline
|
GUPCO |
2007 |
Detailed design of an 18km x 16” replacement trunkline
and associated tie-in spoolpiece, riser and shore approach. |
Rehabilitation Phase 1
July 37 to July 10 Pipeline
|
GUPCO |
2007 |
Detailed design of a 1.4km x 12” replacement flowline
and associated tie-in spoolpieces and risers. |
Rehabilitation Phase 1
October C to October P Pipeline
|
GUPCO |
2007 |
Detailed design of a 3.0km x 16” replacement flowline
and associated tie-in spoolpieces and risers. |
Rehabilitation Phase 1
October A to October P Pipeline
|
GUPCO |
2007 |
Detailed design of a 2.2km x 20” replacement flowline
and associated tie-in spoolpieces and risers. |
Rehabilitation Phase 1
Badri to Morgan Pipeline
|
GUPCO |
2007 |
Detailed design of a 2.3 km x 16” replacement
flowline and associated tie-in spoolpieces and risers. |
| Saqqara Pipeline |
BP |
2007 |
Comprehensive integrity management assessment for the
Saqqara 16-inch production line as well as 8-inch gas
lift riser. Scope included risk assessment for each element
of the Saqqara pipeline system which was used to define
an inspection and monitoring plan as part of PIM scheme. |
| TGPS Turkey to Greece Pipeline |
Oztas-Peker JV |
2006 |
Detailed design of the offshore section of the Turkey
to Greece pipeline that crosses the Bosphorus. This is
a 36” gas trunkline, reaching a maximum water depth
of 60m. Scope included burial, stability and protection
design for the shipping channel and the design of the
two shore approaches. |
| North Idku Pipelines |
NIPETCO |
2006 |
Structural design review for Platforms and topsides
for the two main platforms in North Idku field. Scope
of work included a full review and calculation of projected
weight for the four pile jacket and foundation, and assessment
of using a 3 leg configuration system. |
| North Idku Pipelines |
Genesis
(NIPETCO Consortium) |
2006 |
Detailed design of pipelines, 10” line from Platform
NP2 to NP1, and 16” pipeline from NP1 to shore of
Mediterranean sea. |
| West Akhen Pipeline |
GUPCO |
2006 |
Integrity assessment and developing a remediation and
repair plan for the snagged 6" Akhen condensate line
bypass. |
| Western Desert to Dashour Pipeline |
GUPCO |
2006 |
Engineering of a first stage repair programme for 8-inch
pipeline to assess integrity and reduce the risk of failure
to acceptable levels prior to a more comprehensive rehabilitation
programme being undertaken. |
| DNV IPIC & Petrojet Inspection |
DNV |
2006 |
Pipeline inspection and supervision on concrete coating
procedure for El-Arish to Ashqelon 26-inch pipeline at
Petrojet coating yard in Port Said. |
| Technical Training Programme |
Petroleum Marine Services (PMS) |
2005/6 |
Provided pipeline engineering technical training course
to PMS engineers covering main concepts of pipeline design. |
| Raven Field |
BP |
2006 |
Performed conceptual studies for the BP Raven deepwater
gas development. Work included review of pipeline installation
across deepwater channel soft foundations for manifolds
and assessment of seabed movements. |
| Duba |
Petroluem Marine Services (PMS) |
2004 |
Performed the installation engineering for a novel floatover
of a new deck for the offloading platform located on the
coastline of the Persian Gulf. Undertook structural checks
for barge and determined strengthening requirements. |
| Duba |
Petrojet |
2005 |
Pile driveability analysis for Duba Project Onshore
section to ensure appropriate piling technique. |
| ESMA II |
GUPCO |
2005 |
Performed a design review and risk assessment of the
ESMA II pipeline configuration and operating conditions
to determine the fitness for purpose for the remaining
operational life. |
| Saqqara Early Production System |
GUPCO |
2005 |
Internal corrosion analysis and materials selection
study for temporary early production system for the GUPCO
Saqqara project. |
| Ras Shukheir Loading Lines |
GUPCO |
2005 |
Assess integrity of main oil export loading lines from
the Ras Shukheir tank farm to the tanker bays. |
| Gulf of Aqaba Inspection Database and Pipeline Engineering
Training Course |
EGC |
2005 |
Provided technical training course to EGC engineers
covering main concepts of pipeline design. |
| Agiba Ashrafi Field |
Impresub |
2005 |
Performed route design engineering for 8-inch gas lift
pipeline during the pre-engineering survey to choose the
most appropriate route through the Ashtrafi field in the
Red Sea. |
| Sidi Krir Pre-QMS |
Enppi |
2002 |
Provided a technical report as part of the overall feasibility
study for a new marine filling station at Sidi Kerir Terminal,
Alexandria in Egypt. Fuel oil and diesel oil will be offloaded
(1000 to 3000 tonne/hr) from tankers (500 to 5000 tonne)
at an existing SBM/PLEM via replacement 2 x 5.5km long
offshore loading lines and 2 x 1km onshore pipelines. |
| Gulf of Aqaba Pipeline |
East Gas Company (EGC) |
2001/02 |
Project management, detailed design, installation and
commissioning supervision for a 17 km x 36” pipeline
crossing the Gulf of Aqaba in 900m water depths. The project
presented numerous technical challenges due to the water
depth, the uneven seabed terrain, seismic conditions and
the environmental constraints. It remains to-date the
deepest water 36” installed and the first pipeline
approved by DnV without hydrotesting. |
| Scarab/Saffron |
Burullus |
2001 |
Verification of manifold foundation design. |
| West Akhen Pipeline |
GUPCO |
2000/01 |
KW provided engineering supervision of design of the
6-inch pipeline as well as installation engineering and
trenching supervision. |
| Hap’y |
GUPCO |
1999/00 |
Management and supervision of alternative trenching
operation and stabilisation of pipe. |
| Back