| Project |
Client |
Date |
Scope of Work |
Shah Gas Development
U.A.E. |
Fluor |
2008 |
FEED design of an onshore Sulphur Transportation System,
in the UAE. The system consists of a series of insulated
PIP pipelines (adding up to a total of over 800km), in
which molten sulphur is transported on the inner pipe.
In the annulus of the PIP system, superheated water is
circulated to maintain the sulphur temperature within
the range at which it can be transported in liquid format,
i.e. between 125 and 150C. The design also includes single,
insulated water return pipelines to circulate the superheated
water. |
Jasmine Field
North Sea |
ConocoPhillips |
2008 |
The Jasmine field (nominally HPHT) is a rich gas condensate
field located approximately 9km west of the existing Judy
platform in ConocoPhillips J-Block operating unit. Key
is experience of scour and fishing in the area and previous
work on Jade pipeline project. KW provided CoP with some
of the Pipeline Concept Engineering Services by considering
different pipeline options (i.e. single insulated pipeline
and pipe-in-pipe options) and insulation coatings. Different
pipeline configuration options were considered such as;
cooling spools with pipeline trenching and backfilling,
shallow burial with intermediate spools, and surface snake
lay option. The vulnerability of different pipeline options
to upheaval buckling and lateral buckling were all assessed. |
Starling
North Sea |
Shell |
2006– |
KW undertook the detailed design of the 12”/20”
x 33km PIP and tie-in spools from Starling manifold to
Shearwater platform. Pressure was 265 barg and temperature
110 C. |
Tangguh Field Development
Indonesia |
BP |
2001/7 |
KW undertook the preliminary design of the wet insulated
20km pipeline considering various outer diameters (26”,
22”, 18”, 16”). Pressure was 132 barg
and temperature 110 C. KW also undertook the preparation
of CRA lined pipe (mechanically bonded) test specification
and budget. Supervision of test, assessment of results
and preparation of installation and operation limits.
In addition, KW undertook FEED review and review of Saipem
detailed design and UHB design. |
Devenick Field Development
North Sea |
BP |
2004/7 |
KW undertook the pre-FEED engineering of the 10”
x 12km wet insulated pipeline transporting corrosive fluids.
KW also reviewed the detailed design for BP and assessed
the provision of suitable pipe materials / costs. Pressure
was 620 barg and temperature
135 C. |
Teal
North Sea |
Shell |
2006 |
KW undertook the detailed design of the 8” x 1.5km
super duplex wet insulated infield pipeline. Pressure
was 272 barg and temperature 130 C. |
| Mallard |
Shell |
2006 |
KW undertook the in place analysis of the 8”/16”
x 15km anchor damaged PIP pipeline and design of the repair/re-instatement.
Pressure was 475 barg and temperature 125 C. |
Howe P2 Development
North Sea |
Shell |
2005/6 |
KW undertook the detailed design of the 6” x 3.6km
wet insulated pipeline. Pressure was 324 barg and temperature
128 C. |
WaGE
North Sea |
Paladin |
2005/6 |
KW undertook the detailed design of the 6/10”
x 11km PIP pipeline and other wet insulated pipelines
as well as the subsea structures. Pressure was 379 barg
and temperature 120 C for the PIP. |
Rhum Field Development
North Sea |
BP |
2002/6 |
KW undertook the supervision of the detailed design
of the 8/14” PIP system, transporting highly corrosive
fluids. KW also undertook the preparation of CRA lined
pipe (mechanically bonded) test specification and budget,
supervision of test, assessment of results and preparation
of installation and operation. KW provided independent
verification of ultimate strength and upheaval bucking
response of reeled PIP system using non-linear FEA. Pressure
was 709 barg and temperature 120 C. |
Howe Field PI Development
North Sea |
Shell |
2003/4 |
KW undertook the detailed design of the 8/12”
x 14km PIP system. Pressure was 324 barg and temperature
128 C. |
Terra Nova
Newfoundland |
Petro-Canada |
2003 |
KW undertook the concept design of 10/16” PIP
system and two single wet insulated infield flowlines.
Pressure was 320 barg and temperature 100 C. |
Baobab Field Development
West Africa |
CNR |
2003/4 |
KW undertook the detailed design of a 12/16” x
11km long PIP and and 6” single pipe, and associated
in-line Wye and Tee structures. KW also provided installation
support and fitness for purpose assessment. Pressure was
235 barg and temperature 65 C. Water depths reached 1500m
offshore West Africa. |
| Braemar |
Marathon |
2002/3 |
KW undertook the assessment of reeling of the 6/10”
PIP and effect of reeling on operation. Pressure was 586
barg and temperature 115 C. |
Jade Field Development
North Sea |
Phillips |
2000/5 |
KW acted as owner engineer for Phillips UK supervising
and assessing the 16/20” x 18km pipe-in-pipe design
work by JPK and EMC, and the spool design work by APA.
In addition, KW undertook the review and verification
of complete Jade pipeline design, the detailed verification
of lateral snaking analysis performed by JPK and EMC.
KW also supported Phillips for the assessment of the pipeline
during the operating phase including the pipeline protection
measures. Pressure was 160 barg and temperature 160 C. |
Erskine Replacement Pipeline
North Sea |
Texaco |
2000 |
KW performed the verification of the 16/24” x
30km PIP and provided specialist engineering including
strain based design, limit state design, upheaval buckling
and review of reports from the design team. KW also performed
the design and supervised the testing and analysis of
CRA lined (metallurgically bonded) riser. Pressure was
118 barg and temperature 150 C. |